The first receiving decision is whether the coffee that arrived matches the order and can enter the distributor's available stock. A signed delivery receipt, a correct pallet count and a clean outer carton answer different questions. None replaces the full receiving record.
Build the process around three outputs: a reconciled quantity by SKU and lot, evidence for every discrepancy, and a documented release decision. This gives purchasing, warehouse staff and quality assurance the same version of events. It also prevents a shortage from being hidden inside an apparently complete delivery.
Give the receiving team the approved purchase order, current packing list, expected arrival reference and product master. The product master should identify the exact consumer pack, carton contents and item code. A general description such as Vietnamese instant coffee is insufficient if the order contains different recipes or pack sizes.
Agree who can resolve substitutions, who can authorize stock release and where held goods will go. Include the supplier and transport contacts used for discrepancy reports. If relevant documents are still missing, mark that gap before the delivery reaches the bay; the receiver should not have to reconstruct the order from a driver's paperwork.
Pre-arrival planning can use findings from pre-shipment inspection. Receiving checks the consignment after its journey, including changes or damage observed on arrival. Keep the two records linked by shipment reference so discrepancies can be investigated across both stages.
Record arrival time, vehicle or container reference, and the delivery document number. Where a seal reference was agreed, record the observed seal and any mismatch. Photograph the overall load and visible problems before rearranging it, then capture close-ups that identify the affected carton or pallet.
Look for crushed or wet cartons, torn wrapping, punctures, unusual odours, visible pest evidence and unstable loads. Record observations directly: wet patch on carton side is more useful than poor quality. Separate what staff saw from what they suspect caused it.
Decide with the responsible warehouse or QA lead how unloading can proceed while preserving affected goods. A receiving team can document and segregate a concern without making a food-safety conclusion. Protective packaging is an important part of product handling, as described in Codex food-hygiene principles.
Count pallets, cartons and any loose units separately. Compare each count with the packing list, then compare the packing list with the purchase order. These checks reveal different problems: a short delivery, an incorrect shipment declaration, or goods that were never ordered.
Use a receiving worksheet such as this:
| Check | Record | Action when it does not match |
|---|---|---|
| Order identity | PO, supplier, shipment reference | Resolve document mismatch |
| SKU identity | Item code, recipe, pack size | Hold unapproved substitution |
| Carton quantity | Expected and physically received | Recount and record variance |
| Carton contents | Declared units and checked contents | Investigate packing difference |
| Lot identity | Printed code and quantity per lot | Clarify unreadable or missing codes |
| Pack condition | Affected cartons and units | Segregate for assessment |
| Stock status | Received, held, released or rejected | Record decision and owner |
Do not convert cartons to retail units using a remembered case pack. Use the confirmed case configuration for that SKU. If staff open cartons to check contents, follow the agreed receiving procedure and record which cartons were checked. Inspection scope should reflect the product, contract and responsible QA plan; a universal sample count would ignore those differences.
A product code identifies the item; a lot code distinguishes a production group within that item. Record the lot exactly as printed, including letters and separators. Keep date markings in separate fields and preserve the manufacturer's date terminology rather than relabelling every date as an expiry date.
The GS1 Global Traceability Standard treats shipping and receiving as traceability events and supports identification at product and batch or lot level. For the distributor, the practical question is simple: can the team show which quantity from which lot entered which location?
Split the receiving line when a SKU arrives in multiple lots. A note saying assorted lots does not support a later targeted hold or withdrawal. If the carton code and consumer-pack code differ unexpectedly, photograph both and ask the supplier to explain the relationship before finalizing the record.
Use different fields for missing goods, wrong goods and goods awaiting condition assessment. This avoids counting a damaged carton twice: once as a shortage and again as held stock. Maintain a physical hold location and a matching system status so the stock cannot be allocated accidentally.
Consider this fictional receiving example. The PO and packing list show 120 cartons of one coffee SKU, with 24 retail packs per carton. The team physically receives 118 cartons: 114 appear intact and four have visible crushing and remain held. The shortage is two cartons, or 48 packs. The held quantity is four cartons, or 96 packs. The potential release quantity is 114 cartons, or 2,736 packs, subject to the authorized receiving and QA checks.
Those totals reconcile to the order: 2,736 potentially releasable packs plus 96 held packs plus 48 missing packs equals 2,880 ordered packs. The example distinguishes inventory arithmetic from the condition decision. The four held cartons have not automatically become rejected goods, and the 114 intact-looking cartons still require the applicable release checks.
For each concern, record the shipment, SKU, lot, affected quantity, observation, photographs and physical location. Add who found it and when. Ask the responsible QA person to decide the next step: further inspection, supplier clarification, another assessment, release, partial release or rejection under the agreed process.
Purchasing should send the supplier a concise reconciliation with evidence and a requested response. Keep the stock decision separate from any credit or replacement discussion. A proposed credit does not establish that the product is suitable for distribution.
When the decision arrives, update both the quantity and status, naming the approver and decision reference. If only part of a lot is released, ensure staff can distinguish the released and held cartons physically. Avoid a general email approval that leaves warehouse staff guessing which units it covers.
Before closing the receipt, confirm that physical quantities, system quantities and lot records agree. Check that shortages have an owner, holds have a review date, and released stock has a destination location. Purchasing, finance and warehouse staff should use the same final quantity record when checking invoices or replenishment.
Keep the original count and subsequent corrections visible. If a recount changes a quantity, record the reason rather than overwriting the first observation without explanation. This helps the next receiving team improve its checks and makes a supplier discussion easier to follow.
For a planned Vietnamese coffee shipment, contact MR.VIET wholesale with your destination market, distribution channel, coffee format and expected volume. Include the receiving data your warehouse needs, such as carton configuration, lot identification and supplier storage instructions, so these can be confirmed before the order arrives.